The House Project

Third Floor

Very Much A Work In Progress!

The third floor was gutted when I bought the house. It was a mess. It will be the final portion of the house that I do much with. When complete, it should have two bedrooms and a bath. But for now it is just trying to do the basic maintenance.

A small "tornado" or "micro burst" in April 2007 did some significant damage to the roof. The slate underneath prevented much leaking, but the roof was going to have to be replaced. In preparation for that replacement, I put in a new window on the back side of the third floor since all that was there when I bought the house was a storm window. I also removed the southwest chimney down to the roof level so it could be roofed over. Pictures of the house with the new roof will be forthcoming.

3920-russell-h.jpg
Back stairs to the third floor and down to the kitchen.

100_2859.jpg
From the outside! You can see some of the wind damage!

100_2899.jpg
Lots of work to do.

100_2900.jpg
Gutted! And the floor was sagging!

IMG_1864.jpg
The Flooring Had to Be Ripped Out

IMG_1865.jpg
A Stack of Ripped Out Flooring Boards

IMG_2229.jpg
New Joists Were Added to Level the Floor!

IMG_2235.jpg
More Work!

IMG_2246.jpg
More Flooring!

IMG_2244.jpg
Starting to Take Shape!

IMG_2301.jpg
Wiring for the AC

img_2321.jpg
Framing the Doorway and Closet

img_2327.jpg
The Drywall Work Begins--Again

The air conditioning is roughed in.  I've got the doorway and closet framed in and I'm starting to put up some more drywall.  I still have some subfloor to get down, but I can do a few other things inbetween.  I also need to get the bathroom laid out and work on the plumbing.   With warmer weather approaching I'll probably have to slow down on the project.  I started working on the 3rd floor in earnest in December 2008.  My original plan was to just drywall and be done with it.  But the floor had too much of a sag.  So during late December I ripped out all of the old flooring and began the process of leveling the floor.

100_2858.jpg
A new window! There was originally no header!

100_2861.jpg
And the chimney is gone!!!

IMG_2308.jpg
New Shingles, Looks Much Nicer

IMG_2314.jpg
New Roof From the Front

IMG_2312.jpg
New Roof, Close Up

IMG_1844.jpg
Started Working on the Drywall and Then Decided the Floor Had to be Leveled

IMG_1867.jpg
Removing the Flooring Was Quite a Mess!

IMG_1889.jpg
Finally, Most of the Flooring Is Gone!

IMG_2227.jpg
Starting To Put the New Subfloor Down!

IMG_2238.jpg
Supports Under the Window Had to Be Fixed!

IMG_2240.jpg
Still More Flooring!

IMG_2297.jpg
Where the Bathroom Will Eventually Be

IMG_2300.jpg
Wiring Ready for the AC Contractor

img_2323.jpg
The Outside Portion of the AC Unit is In Place. Waiting on Some Drywall Work for Completion.

ac-inside.jpg
AC Inside Unit -- Very Quiet

alcove-1-.jpg
Working on the Last Area of the Flooring

alcove-2.jpg
North East Alcove -- Last area to be ripped up, now ready for new subfloor.